ReCYN Process Dashboard
Gold Mine — Cyanide Recovery Plant · Live
No data loaded
● 0 OFF-SPEC

Plant status — period

Process Block Flow
Period summary · dashed streams animate with active flow direction
TAILINGS FEED Plant tail · inlet Flow — m³/h Solids —% METAL ADS TK-001 / TK-002 TK1 CN — mg/L TK2 CN — mg/L Tail Au — mg/L Cu ELUTION CM-001/002/003 → Copper tab for detail Cu STRIPPING Col No.1 Efficiency —% Feed NaCN — ppm Cu PRECIP Reactor / Thickener Reactor pH Cu CEMENT Product stream CN ADS TK-003 / TK-004 Tail CN — mg/L Tail Au — mg/L CN removal —% CN ELUTION 188-CM-001/002/003 → CN Recovery tab CN STRIPPING 188-CM-005 Efficiency —% Feed NaCN — ppm SCRUBBER HCN absorption Outlet NaCN — mg/L Air flow — m³/h NaCN PRODUCT To plant · period Period total — t tailings Cu loaded Cu eluate Cu barren precipitate CN loaded CN eluate HCN air NaCN slurry HCN gas LEGEND slurry Cu circuit NaCN stream = good status Period: — → — Simulated values — live data not yet connected.
CN Profile — Latest 48h
NaCN Recovery — Last 7 Days
Feed & Throughput
Slurry flow, feed solids, and feed [CN]
Metal Adsorption — TK-001 & TK-002
Cyanide profile through metal adsorption tanks
pH profile
Met Tail metals
Cyanide Adsorption — TK-003 & TK-004
Cyanide profile through CN adsorption tanks
pH profile
CN Tail metals
Full [CN] Waterfall — Feed to CN Tail
Column Operating Times
Per-Column Elution Detail
CN Stripping — 188-CM-004
CN Stripping — 188-CM-005
Scrubbing & NaCN Production
CN Stripping — Air Flow & Column Pressure
Copper Column Operating Times
Per-Column Cu Elution Detail
Copper Precipitation — Reactor pH
Cu Stripping — NaCN Strip Efficiency
NaCN Balance — Daily
CN Stripping NaCN (daily totals)
Reagent Consumption (daily totals)
Cu Circuit Specific Consumption (kg/kg Cu)
CN Circuit Specific Consumption (kg/kg NaCN)
 DAILY · KPI LOG
No data
KPI Period Breakdown
No data

Upload Data

Upload the monthly Excel workbook (ReCYN Plant Monitoring file) to load new process data.

Settings are locked

Operational Targets (read-only)